PRED Logo
Sri Anumula Revanth Reddy
Sri Anumula Revanth Reddy
Hon'ble Chief Minister
Smt Dansari Anasuya (Seethakka)
Smt Dansari Anasuya (Seethakka)
Hon'ble minister for PR & RD
Sri. Naveen Mittal, IAS
Sri. Naveen Mittal, IAS
Special Chief Secretary to Govt, PR&RD
Sri Anumula Revanth Reddy
Sri Anumula Revanth Reddy
Smt Dansari Anasuya (Seethakka)
Smt Dansari Anasuya (Seethakka)
Sri. Naveen Mittal, IAS
Sri. Naveen Mittal, IAS

Assets

ROADS
The total length of the rural roads under control of Panchayat Raj Engineering Department as on 02/06/2014 is 64044 KMs with the following surface details as on 01/04/2026:
Road mileage Status in PRED in 2014 and 2026
Sl.NO. Type Of Road Surface Length In Km (As On 02.06.2014) Length In Km (As On 01.04.2026)
1 Cement Concrete 1717.00 5521
2 Bituminous 18564.00 25917
3 WBM 14145.00 7085
4 Gravel Roads 14734.00 12304
5 Earthen Roads 14884.00 18493
TOTAL 64044.00 69320
CD works details as on 01.04.2025
Sl.NO. Type of CD Work Nos.
1 Major Bridges 549
2 Minor Bridges 976
3 Causeways 1276
4 Road dams 4055
5 Slab Culverts (upto 6m) 8903
6 Cuddy stone culverts 764
7 Pipe Culverts 56246
Total 72769
Total No. of Habitations including GPs: 24,359
Status Of Road Connectivity To GPs & Habitations
Sl.NO. Gram Panchayats (GPs) As on 02.06.2014 As on 01.04.2023
1 Total No.of GPs in the state 8684 12769
2 No. of GPs connected with BT Roads 7928 12275
3 No. of GPs for which BT roads are sanctioned and work in Progress / Procurement 72
4 No. of GPs not connected with BT Roads 756 422
5 No. of GPs connected with BT Roads after formation of Telangana State 4347